Modular boiler houses Rossen MKB 0.1, MKB 0.2, MKB 0.3, etc.
Modular hot-water boilers of the MKV brand are designed for heating and hot water supply of communal, industrial, administrative, social and cultural facilities.
They can be used as a central or autonomous energy source. Water-tube boilers, burners, pumping and heat exchange equipment, automation and safety systems of the world's leading manufacturers are installed in boiler rooms.
Main advantages:
- The boiler room is made in the form of one or more blocks, which provides it with high mobility;
- The boiler room is available as a fully ready-to-use product;
- A minimum package of permits is required for the installation of a boiler room;
- High-quality components from the world's leading manufacturers are used in the manufacture of boiler houses;
- Cost-effectiveness and low heat production costs;
- Full automation, which does not require the presence of maintenance personnel in the boiler room;
- The possibility of remote control over the operation of the boiler room;
- The boiler house is manufactured, installed and put into operation in a short time from 2 to 4 months.
Models: MKV-0.1 GAS, MKV-0.2 GAS, MKV-0.3 GAS, MKV-0.4 GAS, MKV-0.5 GAS, MKV-0.6 GAS, MKV-0.8 GAS, MKV-1.0 GAS, MKV-1.2 GAS, MKV-1.6 GAS, MKV-2.0 GAS, MKV-0.4 GAS-DIESEL, MKV-0.6 GAS-DIESEL, MKV-0.8 GAS-DIESEL, MKV-1.0 GAS-DIESEL, MKV-1.6 GAS-DIESEL, MKV-2.0 GAS-DIESEL, MKV-3.0 GAS-DIESEL, MKV-4.0 GAS-DIESEL, MKV-6.0 GAS-DIESEL, MKV-8.0 GAZ-DIESEL, MKV-10.0 GAZ-DIESEL, MKV-12.0 GAZ-DIESEL, MKV-40.0 GAZ-DIESEL.
All Rossen products
About Rossen
-
effectiveness
Thanks to the most modern technologies used in production, and the availability of our own production facilities, we are ready to offer efficient and reliable equipment at optimal prices. -
service
The complex of maintenance activities usually includes: a monthly visit to the facility with mandatory routine maintenance work on adjustment, cleaning, and tuning of equipment. -
montage
The installation department employs employees with more than 20 years of installation work experience and have all the necessary certifications and permits. We have implemented more than 200 objects of various degrees of complexity.
- (727)345-47-04
- (3955)60-70-56
- (8182)63-90-72
- (8512)99-46-04
- (3852)73-04-60
- (4722)40-23-64
- (4162)22-76-07
- (4832)59-03-52
- (8352)28-53-07
- (351)202-03-61
- (8202)49-02-64
- (3022)38-34-83
- (395)279-98-46
- (4932)77-34-06
- (3412)26-03-58
- (4012)72-03-81
- (4842)92-23-67
- (843)206-01-48
- (3842)65-04-62
- (4212)92-98-04
- (8332)68-02-04
- (4966)23-41-49
- (4942)77-07-48
- (861)203-40-90
- (391)204-63-61
- (3522)50-90-47
- (4712)77-13-04
- (4742)52-20-81
- (3519)55-03-13
- (375)257-127-884
- (495)268-04-70
- (8152)59-64-93
- (8552)20-53-41
- (831)429-08-12
- (3843)20-46-81
- (383)227-86-73
- (3496)41-32-12
- (3812)21-46-40
- (4862)44-53-42
- (3532)37-68-04
- (8412)22-31-16
- (342)205-81-47
- (8142)55-98-37
- (8112)59-10-37
- (863)308-18-15
- (4912)46-61-64
- (812)309-46-40
- (846)206-03-16
- (8342)22-96-24
- (845)249-38-78
- (8692)22-31-93
- (3652)67-13-56
- (4812)29-41-54
- (862)225-72-31
- (8652)20-65-13
- (3462)77-98-35
- (8212)25-95-17
- (4752)50-40-97
- (998)71-205-18-59
- (8482)63-91-07
- (3822)98-41-53
- (4872)33-79-87
- (4822)63-31-35
- (3452)66-21-18
- (347)229-48-12
- (3012)59-97-51
- (8422)24-23-59
- (8672)28-90-48
- (4922)49-43-18
- (423)249-28-31
- (844)278-03-48
- (8172)26-41-59
- (473)204-51-73
- (4112)23-90-97
- (4852)69-52-93
- (343)384-55-89